Report

S31: In-line Timber Bridge Replacement Options

Authors
Thisara Pathirage
Jayaratna Mahagamage
Recent Reports
Final Report
P149: Moisture Susceptibility of Asphalt Mixes
October 20, 2026
Pavements
Performance
Project Report
P152: Increased Use of Reclaimed Asphalt Pavement Material
October 20, 2026
Pavements
Performance
Final Report
R157: The life cycle economic feasibility of noise barrier caps Y2
June 1, 2026
Network Operations
Sustainability
September 8, 2018

Queensland Department of Transport and Main Roads (TMR) is currently managing over 300 ageing timber bridges, of which the residual service lives are potentially being consumed by the increasing freight demand. Some of these bridges may require replacing in near future to meet the road demand and ensure safe operation.

Download ReportDownload Report