Report

R77: Realtime determination of spare capacity of routes for enhanced management of congested road network Stage Two Year Two (2019/2020)

Authors
Neeraj Saxena
Kenneth Lewis
Donald Shackleton
Recent Reports
Final Report
P149: Moisture Susceptibility of Asphalt Mixes
October 20, 2026
Pavements
Performance
Project Report
P152: Increased Use of Reclaimed Asphalt Pavement Material
October 20, 2026
Pavements
Performance
Final Report
R157: The life cycle economic feasibility of noise barrier caps Y2
June 1, 2026
Network Operations
Sustainability
March 18, 2021

This report acts as the summary report for Year 2 (first year of Stage 2) of the project looking at real-time determination of spare capacity of routes for enhanced management of congested road networks. This report builds upon the findings of Stage 1, which utilised departure detectors to identify congestion and estimate spare capacity.

Download ReportDownload Report