Report

R77: Realtime determination of spare capacity of routes for enhanced management of congested road network - Case Study - Stage Two Year Three (2020/2021)

Authors
Neeraj Saxena
Kenneth Lewis
Donald Shackleton
Recent Reports
Final Report
P149: Moisture Susceptibility of Asphalt Mixes
October 20, 2026
Pavements
Performance
Project Report
P152: Increased Use of Reclaimed Asphalt Pavement Material
October 20, 2026
Pavements
Performance
Final Report
R157: The life cycle economic feasibility of noise barrier caps Y2
June 1, 2026
Network Operations
Sustainability
January 18, 2021

This report acts as the final report for Year 3 (Stage 2 Year 2) of the project looking at real-time determination of spare capacity of routes for enhanced management of congested road networks. This report presents the findings from Task 2.5 which signifies calibration and validation of the prototype using a case study (developed under Stage 2). The case study area comprised two arterial routes, Smith Street and Kumbari Avenue, on the Gold Coast. Bluetooth, CCTV and detector data for 24 intersections on the two routes were available and used for analysis.

Download ReportDownload Report