Report

R72: Milled Rumble Strips (Year 1 - 2017/18)

Authors
Samantha Taylor
Joseph Affum
Recent Reports
Final Report
P149: Moisture Susceptibility of Asphalt Mixes
October 20, 2026
Pavements
Performance
Project Report
P152: Increased Use of Reclaimed Asphalt Pavement Material
October 20, 2026
Pavements
Performance
Final Report
R157: The life cycle economic feasibility of noise barrier caps Y2
June 1, 2026
Network Operations
Sustainability
February 22, 2019

The main purpose of the study was to design a trial methodology to install milled rumble strips on Bruce Highway. However, since no TMR region is interested in conducting the trial, the project has been put on hold.

Download ReportDownload Report