Project R22 aims to produce a methodology for estimating excessive congestion costs associated with multiple road users that include: passenger cars, heavy vehicles (HVs), buses, cyclists and pedestrians. Two case studies, one for bus delay cost estimation and one for freeway before-and after congestion cost comparison are proposed to test the methodology.
Download ReportDownload Report