Report

O17 Investigation of Factors Affecting Fish Passage in Culverts: Part 2 (2020–21) Development of Precast or Prefabricated Box Culvert Design Concept for Fish Passage

Authors
Darby Johannessen
Louise Dutton
Ross McMillan
Recent Reports
Final Report
P149: Moisture Susceptibility of Asphalt Mixes
October 20, 2026
Pavements
Performance
Project Report
P152: Increased Use of Reclaimed Asphalt Pavement Material
October 20, 2026
Pavements
Performance
Final Report
R157: The life cycle economic feasibility of noise barrier caps Y2
June 1, 2026
Network Operations
Sustainability
August 11, 2022

Currently in Queensland, waterway barrier works approvals are required for the installation of culverts in waterways where fish passage is of concern. The Queensland Department of Agriculture and Fisheries (DAF) Accepted Development Requirements for raising or constructing Waterway Barrier Works (ADR) specify full-height corner-angle baffles where baffles are stipulated.

Download ReportDownload Report