Report

O17 Investigation of Factors Affecting Fish Passage in Culverts (2019/20)

Authors
Darby Johannessen
Neal Lake
Louise Dutton
Recent Reports
Final Report
P149: Moisture Susceptibility of Asphalt Mixes
October 20, 2026
Pavements
Performance
Project Report
P152: Increased Use of Reclaimed Asphalt Pavement Material
October 20, 2026
Pavements
Performance
Final Report
R157: The life cycle economic feasibility of noise barrier caps Y2
June 1, 2026
Network Operations
Sustainability
July 6, 2020

Currently in Queensland, waterway barrier works approvals are triggered by constructing or raising a waterway barrier, which includes new or modified culverts, causeways, some bridges and flood ways due to the associated physical barriers to fish passage including increased water flow velocities. Fish passage requirements for culverts where waterway barrier works are required are prescriptively defined by the Queensland Department of Agriculture and Fisheries (DAF) including a requirement for full-height rectangular baffles. Where designs do not comply with the prescriptive designs the applicant must prove that the design is suitable for fish passage, and the current body of knowledge available on what is ‘suitable for fish passage’ is limited.

Download ReportDownload Report