Report

Addendum to R22: Measuring On-Road Congestion Costs for Multi-Modal Travel - Case Study 2: Bruce Highway Managed Motorway Project

Authors
Kevin Wu
Dr Ronny Kutadinata
Dr Clarissa Han
Recent Reports
Final Report
P149: Moisture Susceptibility of Asphalt Mixes
October 20, 2026
Pavements
Performance
Project Report
P152: Increased Use of Reclaimed Asphalt Pavement Material
October 20, 2026
Pavements
Performance
Final Report
R157: The life cycle economic feasibility of noise barrier caps Y2
June 1, 2026
Network Operations
Sustainability
January 11, 2018

The technical note is prepared to extend the NACoE Project R22: Measuring On-Road Congestion Costs for Multi-Modal Travel Case Study 2: Beforeand-after comparison of congestion cost for the Bruce Highway managed motorway with two additional After-periods’ data from 2017 and 2018. It aims to determine the changes in traffic performance after three managed motorway strategies were implemented long Bruce Highway in the past a few years

Download ReportDownload Report