Report

A35: Identification of Residual Risk for each Element and Development of a Funding Allocation Methodology of Elements (2018 19: Year 2)

Authors
Dr Tim Martin
Georgia O'Connor
Ulysses Ai
Recent Reports
Final Report
P149: Moisture Susceptibility of Asphalt Mixes
October 20, 2026
Pavements
Performance
Project Report
P152: Increased Use of Reclaimed Asphalt Pavement Material
October 20, 2026
Pavements
Performance
Final Report
R157: The life cycle economic feasibility of noise barrier caps Y2
June 1, 2026
Network Operations
Sustainability
February 2, 2021

This report summarises the progress and outcomes to date for the National Asset Centre for Excellence (NACoE) Project A35 Identification of Residual Risk for each Element and Development of a Funding Allocation Methodology of Elements.

Download ReportDownload Report